Pipe Arch under Rail Mainline

Pipe Arch under Rail Mainline

The overall scope of work included the design, contract administration, and construction inspection services for 27 metres of 3,100 x 1,980 periphery pipe-arch as a stand-alone structural liner. The work was required to satisfy a 75-year design life requirement.

John Kupskay and his staff (then operating as Paragon Engineering) reviewed the structural suitability of the proposed liner for the existing 27 metre long, 2,300 x 3,500 pipe arch culvert under the BC Rail mainline in Delta, BC.

Location
Delta, BC
Completed
2014
Client
Corporation of Delta

More Binnie Projects

Sewer Rehabilitation in New Westminster

View Project >

Rochester Ravine Storm Sewer

View Project >

Kingsway Sanitary Pump Station

View Project >
Top