Pipe Arch under Rail Mainline

Pipe Arch under Rail Mainline

The overall scope of work included the design, contract administration, and construction inspection services for 27 metres of 3,100 x 1,980 periphery pipe-arch as a stand-alone structural liner. The work was required to satisfy a 75-year design life requirement.

John Kupskay and his staff (then operating as Paragon Engineering) reviewed the structural suitability of the proposed liner for the existing 27 metre long, 2,300 x 3,500 pipe arch culvert under the BC Rail mainline in Delta, BC.

Location
Delta, BC
Completed
2014
Client
Corporation of Delta

More Binnie Projects

Kingsway Sanitary Pump Station

View Project >

Sewer Rehabilitation in New Westminster

View Project >

Sanitary Service for Rainbow Community

View Project >
Top