Pacific Coast Terminals built a new docking facility at a 108-acre site in Port Moody.
Binnie Land Surveying Ltd. provided crews to assist with the construction of a loading system that will transport potash from trains to ships.
Survey staff completed survey layouts for a tunnel and an unloading facility that will service the trains. They staked out the locations of secant piles as well as checked the final location of the piles to ensure they were within tolerance.




